Specific operation
qzz10011
Posted 2016-08-11 1:49 AM (#220668)
Subject: Specific operation


Member

Posts: 16

Specific operation should be in the initial setting when the grout has not yet started stair treads for plastic decks laying floor tiles (on the back should be clean), carried out along the line of control from the inside, not step on the paved floor tiles Stones, the operation should be returned.
Dressing: After the entire paved in tile mat board, people standing on the pad repairs around the corner, and the tile floor and the other then rub the ground at the entrance repaired to ensure access Cha straight. oints (grout should be completed before the final setting bonding layer): After the release paper, timely check Nuiko is uniform, straight Recycled Green Building Materials Nuiko not ring true when, with a small cut on foot than a dial gently along, straightening, and adjusted tile wood cedar board tapped (hammering cedar board), while the paste has been filled off, missing floor tile particles. Floor drain, nozzle, etc.
around the floor tiles, according to pre-trial slope cutting shop, to do tile mosaic with nozzle close match. Pouring: After dialing the next seam (or grout final binding layer after coagulation), with white water or tongue and groove boarding mud and floor tiles with colored cement paste rub seam, cotton yarn dipped in pigment slurry from the inside to the outside along the seam rub, full rub, rub until the real, and timely tile surface than ash clean, pollution prevention across the layers.
Top of the page Bottom of the page